Temperature and pressure reducing device - installation
Update Time:2024-05-06Number Of Views:

1. Professional installation companies or teams shall strictly follow the installation drawings and technical data for installation.

2. Install the temperature and pressure reducing device according to the overall diagram number of the system, and install relevant shut-off valves at the inlet and outlet of the temperature and pressure reducing device for opening and closing.

3. A sliding bracket should be installed at the appropriate position of the temperature and pressure reducing device.

4. When installing each valve, attention must be paid to the flow direction of steam and cooling water. A steam trap should be installed at the lowest point of the steam inlet pipe and the outlet of the cooling device.

5. Ensure the cleanliness of the medium (including steam and cooling water), and the cooling water must be boiler water and softened water. If necessary, filters should be installed on both water and steam inlets.